Case Studies
-
3.5KW Solar PV System – Chichester
This solar panel installation was carried out on a period property in a beautiful West Sussex village. A 3.5KW systems was installed on a clay south-facing roof.
-
11kW system in Chichester
This customer had an annual consumption of about 5000kWh and was after some battery storage that also enabled a house back up option in the event of a power cut. We designed a GivEnergy All in One system with Jinko all black panels. We installed Jinko 420w all black panels on this customers house
-
21kW system in Winchester
This home in Winchester had an annual consumption of around 20,000kWh. The house has a three phase supply, so we chose a SolaX hybrid system with batteries along with a three phase Myenergi Zappi for the customer to charge their electric vehicle. The roofs consisted of mainly flat roof and a small pitched standing seam
-
3.44kW system in Emsworth
This customer had only just moved into their house and knew they wanted solar and battery. We installed 430w panels and a GivEnergy hybrid system to help them store their excess solar energy for night time use. We used the Clenergy mounting system to fix the panels to the peg tile roof. System details:
-
8.4kW system in Midhurst
This customer had some restrictions on what they could have on their roof because of the area they lived in and the age of the house. The requirements were that it was black and in roof. We designed this in roof system using the Viridian panels and mounting system to give a sleek look and
-
610KW Solar PV Array Completed at Trafalgar Drystack, Portchester
Installation of a 610KW solar PV array by Solar Voltaics is completed at Trafalgar Wharf Drystack. The Drystack is home to over 300 motor boats and Rigid Inflatable Boats (RIBs) between 4m and 13m long. Trafalgar Drystack is the largest boat storage facility in Hampshire and the UK. The installation will reduce the electrical demand
-
182KW solar array installed on landmark Milestones Museum, Basingstoke
Installation of a solar array at Milestones Museum of Living History is nearing completion. The museum is home to over 20,000 objects that were either made or used in Hampshire, and is a record of the county’s social, industrial and transport history. The solar PV project, funded by the Salix Public Sector Decarbonisation Scheme (PSDS),
-
384KW Unsubsidised rooftop installation completed for Moog Controls, Tewkesbury
Moog Industrial Group is a Global leader in Industrial Products, Solutions and Services. Their technology and innovations are present in aerospace, construction, defence, energy and many more markets around the World. The new pupose built site with a footprint of 3,600 M2 in Tewkesbury was designed with energy efficiency in mind. The large south
-
Solar Voltaics completes 1MW of solar for local councils
Solar Voltaics completed over 1MW of solar installations for local councils in the six months leading up to the end of March. Portsmouth City Council, a pioneer in deploying solar PV for its social housing stock, has continued its strategy to reduce energy needs for its social housing stock. Solar Voltaics completed a total of
-
47KW PV System Installed for Wallops Wood Cottages
A 47.3KW system has been installed on award winning Wallops Wood Cottages in the Meon Valley within the South Downs National Park. Non-reflective all black solar panels were used to reduce the visual impact and blend with the building envelope. The system will greatly reduce the running costs and carbon footprint of the site which
-
Phase 2 greening of housing stock completed for Woking Borough Council
Solar Voltaics has completed solar installations on 46 properties in Cowshot Crescent and Manor Crescent in Woking, as part of a carbon reduction programme for ThamesWey. ThamesWey is an independent limited company with a single shareholder in Woking Borough Council. The project was part of a package of upgrades to the properties including high thermal
-
286KW Solar installed for West Sussex schools using SolarEdge technology
Solar Voltaics continues to install some of the most sophisticated solar energy systems for West Sussex County Council. Systems have been installed at London Meed School in Burgess Hill, Handcross Primary School, The Brook School in Crawley and Queen Elizabeth II Silver Jubilee School in Horsham. The technical requirements for this group of schools were