Case Study Category: Commercial
-
12.6kWp Installed at Crookhorn School, Hampshire
Crookhorn School partnered with Solar Voltaics to introduce a cost-effective solar solution that would cut energy costs and reduce its environmental impact. The system was designed for optimal efficiency, delivering an 86.6% performance ratio, ensuring maximum utilisation of the available roof space on the flat roof. Key Outcomes Offsetting 5,725kg of CO₂ emissions every year
-
26.84kWp Installed at Havant College, Hampshire
As part of the development of a new building at Havant College, Solar Voltaics was contracted to design and install a high-efficiency solar PV system to support the college’s sustainability goals. The new 26.84kWp system combines premium panel technology with advanced optimisation to account for shading, ensuring maximum energy production year-round. Components: 22 x AIKO
-
158kWp Installed at Everyone Active’s Hart Leisure Centre, Fleet
Hart Leisure Centre is a busy, modern community facility managed by Everyone Active. With extensive sports, swimming, and fitness facilities, the centre operates for long hours each day and has a naturally high daytime electricity demand. Already committed to reducing its carbon footprint, the centre previously installed a PV system on an adjacent building. In
-
257kWp installed on Saint Gobain Abrasives, Gloucestershire
Saint Gobain Abrasives is a leading manufacturer of high-quality abrasive solutions for all commercial abrasive processes. The Staverton site is home to Saint Gobain diamond operations. Saint Gobain wanted to optimise the roof area, in order to generate the maximum amount of solar energy possible for the site. Statistics show that 99.7% of the energy
-
75kWp system installed on Rodgers of York
Rodgers of York is a well-established family-owned business located in the heart of York, specializing in retail and wholesale services for a wide range of products. The company operates a large distribution centre and retail outlet, with a significant energy demand due to its diverse operations, including lighting, heating, and powering warehouse equipment. Annually, the
-
155kWp system installed at Cedar Court Hotel, Wakefield
Cedar Court Hotel is a large venue with hundreds of rooms and hosts numerous wedding events each year. The hotel consumes over 140,000 kWh of electricity annually, with its primary energy demand arising from electric space heating and accommodation requirements. The hotel operates around the clock, meaning a continuous and consistent demand for electricity. In
-
610KW Solar PV Array Completed at Trafalgar Drystack, Portchester
Installation of a 610KW solar PV array by Solar Voltaics is completed at Trafalgar Wharf Drystack. The Drystack is home to over 300 motor boats and Rigid Inflatable Boats (RIBs) between 4m and 13m long. Trafalgar Drystack is the largest boat storage facility in Hampshire and the UK. The installation will reduce the electrical demand
-
182KW solar array installed on landmark Milestones Museum, Basingstoke
Installation of a solar array at Milestones Museum of Living History is nearing completion. The museum is home to over 20,000 objects that were either made or used in Hampshire, and is a record of the county’s social, industrial and transport history. The solar PV project, funded by the Salix Public Sector Decarbonisation Scheme (PSDS),
-
384KW Unsubsidised rooftop installation completed for Moog Controls, Tewkesbury
Moog Industrial Group is a Global leader in Industrial Products, Solutions and Services. Their technology and innovations are present in aerospace, construction, defence, energy and many more markets around the World. The new pupose built site with a footprint of 3,600 M2 in Tewkesbury was designed with energy efficiency in mind. The large south
-
47KW PV System Installed for Wallops Wood Cottages
A 47.3KW system has been installed on award winning Wallops Wood Cottages in the Meon Valley within the South Downs National Park. Non-reflective all black solar panels were used to reduce the visual impact and blend with the building envelope. The system will greatly reduce the running costs and carbon footprint of the site which
-
286KW Solar installed for West Sussex schools using SolarEdge technology
Solar Voltaics continues to install some of the most sophisticated solar energy systems for West Sussex County Council. Systems have been installed at London Meed School in Burgess Hill, Handcross Primary School, The Brook School in Crawley and Queen Elizabeth II Silver Jubilee School in Horsham. The technical requirements for this group of schools were
-
50KW Flat Roof System installed on Connors Keep for PCC
A 50KW system has been installed on Connors Keep north of Portsmouth as an ongoing commitment by Portsmouth City Council to green their housing stock. The system utilised JA Solar panels mounted on an adjustable framework to maximise the installation capacity and overcome complicated positioning of chimneys and flues.